Rucatayo HPP, Chile
In March, 2019 with the technical assistance of Energomashexport’ experts the revision of the 53 MW Kaplan Unit was undertaken at Rucatayo HPP, Chile during the annual overhaul. Within the period of works the recommendations on further operation of the equipment as well as instructions on the purchase of the spares for the forthcoming major overhaul were provided.
14.03.2018
Association of Urban Planning Organizations.
March 6, 2018 Energomachexport Corporation LLC was accepted as a member of the self-regulating organization in Association of Urban Planning Organizations
02.11.2017
Energomashexport Corporation LLC signed contract with Inter RAO-Engineering LLC
12/09/2017 Energomashexport Corporation LLC signed contract with Inter RAO-Engineering LLC for the implementation of work package: supply and installation of the solid fuel feed equipment for the project «Construction of the Primorskaya TPP».
The customer:  Kaliningradskaya Generation LLC
Term of performance of the contract:  2017 – 2018 óy.
14.08.2017
First group of technical experts set down at site of TPP Barh, India
In July 2017, within the contract with the company Doosan Power Systems India Ltd. on the development of technical documentation and commissioning for C&I engineering services on the construction site of Thermal Power Plant "Barh", India, upon the request of the customer, first group of technical specialists consisting of four people was dispatched to the construction Site. The task of the group is to draw up a plan and deadlines for commissioning works at Block 1 and technical assistance during commissioning works, in accordance with the technical documentation developed in the framework of the contract and taking into account the Customer's equipment actually installed to the present moment.            
14.08.2017
New contract signed with Doosan Power Systems India Limited
In June 2017 Energomashexport Corporation LLC signed with Doosan Power Systems India Ltd. new Contract for the audit and control of the installation of coal grinding mills for TPP "Barh", India. Within the framework of the contract, two technical specialists were deputed for the construction site.            
14.08.2017
Certificate of Completion signed with Doosan Power Systems India Limited
In June 2017, Energomashexport Corporation LLC signed with Doosan Power Systems India Ltd. The Certificate of Completion of the entire scope of work under the contract for the provision of engineering services and the development and adaptation to Indian standards of drawings for steel structures and tanks for TPP "Barh".
28.11.2016
Step-down substation Bersenevskaya
Step-down substation Bersenevskaya 110/20/10/6 kV 2õ160 MVA was put onto operation in September 2016. Energomashexport Corporation LLC provided delivery of set if equipment for the presence substation.
The substation is located at Moscow, Bolotnaya Naberezhnaya, 15, , p.10 and 11. Step-down substation Bersenevskaya is designed to provide energy supply for customers in Central, West and South-West district of Moscow. It provided energy supply for architecturally iconic buildings like Christ the Savior Cathedral , House on the Embankment,  "Udarnik" cinema, Estrada theater, the former factory building "Red October", the State Tretyakov Gallery, Russian State Library and others.
28.11.2016
Step-down substation Kotlovka.
Energomashexport Corporation LLC provided delivery of set if equipment for the presence substation. The necessity of putting into operation 220 kV "Kotlovka" in the South-West District due to increasing of demand of electricity use in the infrastructure of District, provided that features the work of the substation in Moscow electricity mains . Key objects: houses, mixed-use complex, important social objects, objects of the municipal order of the district, basic network of 20 kV. At the same time the Step-down substation "Kotlovka" will provide the reliability of the electrical network of 220 kV.
14.07.2016
BARH Super Thermal Power Project Stage – I (3õ660 ÌW), INDIA.
Engineering of the steel structures, tanks, C&I and commissioning works execution for Boiler Island of the 3õ660 ÌW BARH Super Thermal Power Project Stage – I.
EPC Contractor - Doosan Power System India Pvt. Ltd.  Owner – National Thermal Power Corporation Ltd.
Contract execution period: 2016-2018.
10.12.2015
HPP "San Bartolo".
December 2015
Manufacturing and partial tests were completed for the following main equipment:
Generators of 11,5 MVA
Ecological unit of 1,06 MW
Power transformers 11/13,5 MVA
Shipment of the equipment is being planned upon completion of all the tests in accordance with contract requirements.
07.07.2015
Inspection of manufacturing of main equipment/
At the end of June- beginning of July 2015 Bureau Veritas company realized inspection of manufacturing of main equipment as per Final Customer’s order: small hydro unit, manufacturer Vaptech, Bulgaria; hydrogenerators, manufacturer CG Electric, Hungary; hydroturbines, manufacturer CMC Hydro, Spain; power transformers, manufacturer Prime Meiden, India.  
Acceptance tests of hydrogenerators are planned  in August 2015.
30.06.2015
Start date of installation of equipment for Bihagua HPP in Costa Rica
30.06.2015 Start date of installation of equipment for  Bihagua HPP in Costa Rica             
20.05.2015
Delivery of equipment for Bihagua HPP in Costa Rica is completed
20.05.2015 Delivery of equipment  for  Bihagua HPP in Costa Rica is completed            
12.05.2015
Rucatayo HPP - maintenance service of equipment contract.
On the 1st of April 2014 maintenance service and warranty of the equipment Contract was signed for 3 years. This Contract includes maintenance service of the equipment, rectification of discrepancies, audit and supply of necessary spare parts.
18.12.2014
Main equipment tests fulfilled.
The production tests of HPP «Bihagua» (Costa Rica) main equipment were conducted from 8 to 18 December in the presence of the Customer’s representatives :
-2 Generators with 2 lubrication systems
-2 shutters
-2 Speed control systems with MNU
- Control tests of the rotor blades and the 1 and 2 rotors themselves by penetrating agents.
Representatives of the Customer and "Energomashexport Corporation LLC" signed the corresponding test protocols.
26.11.2014
«Energomashexport Corporation LLC» signed a new contract for the HPP "San Bartolo" (Panama) project.
«Energomashexport Corporation LLC» signed a new contract for the HPP "San Bartolo" (Panama) project. The contract provides for delivery of hydraulic turbine equipment for the two units (Kaplan turbines, volutes, mounting hardware and the necessary spare parts). The equipment will be supplied by CMC HYDRO, Spain, ex works. Embedded parts of the 2nd stage will be supplied for the first unit in February, for the second unit - in March 2015. Mechanical equipment for the first unit will be delivered in August, and for the second unit - in September 2015.
15.11.2013
A new contract for the main equipment supply for the HPP in Costa Rica signed.
"Energomashexport Corporation LLC" won the tender for the supply of the main equipment for HPP "Bijagua", located on the rivers Bijagua and Zapote in the north of Costa Rica, near the small town Bijagua de Upala, province of Alajuela . There were 6 participants in this tender, including such well-known company as "Andritz Hydro".

On the 15th November we signed a contract with the customer – “Cooperativa de Electrificación Rural de Guacanaste RL”.

Our supply obligations consists of two horizontal units of 8.75 MW each , including:
-        Turbine;
-        Butterfly valve ;
-        Speed regulator;
-        Generator;
-        The excitation system and voltage regulator;
-        Installation supervision and personnel training;
-        Commissioning;
-        Spare parts supply.
23.08.2013
The successful completion of the audit for compliance with international standards
On 22 and 23 August 2013  in the "Energomashexport  Corporation LLC" was conducted a supervisory audit for compliance with the requirements of ISO 9001:2008 and re-certification audit for compliance with international standards OHSAS 18001:2007 and ISO 14001:2004. Audit of the integrated management system was carried out by international certification body INTERTEK Moody International, with which our company cooperates since 2006.
The auditors have verified all the mandatory requirements of the standards in the major divisions of the corporation. The organization has demonstrated good handling, understanding and monitoring of the standards requirements, the successful implementation of their requirements in the day-to-day activity.
The audit did not identify any discrepancies. Three areas for improvement were identified.
The audit team confirmed that our company’s integrated control system meets all the requirements of ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 and recommended to extend the system certification for the next three years. The original certificates will be processed shortly.
01.08.2013
New contracts signed
"Energomashexport Corporation LLC " signed the contracts for the supply of the complete equipment for two power substations 220/20 kV "Zolotarevskaya" and "Vagankovskaya".
15.07.2013
New contract in Panama
Energolatina, S.A., subsidiary of "Energomashexport Corporation LLC" in Panama,  won the bid and signed a new contract with CILSA Panama, SA for the manufacture, supply and installation of penstocks for mini-HPP "Bajo de Mina" and mini-HPP "Baitun" which are now under construction.  Start of installation works is scheduled for October 2013.            
02.07.2013
HPP "San Lorenzo", Panama, equipment installation
June 29, 2013 the important phase of HPP "San Lorenzo" construction was successfully completed  by the specialists of Energolatina, SA (a subsidiary of "Energomashexport Corporation LLC" in Panama) - transportation and installation in a design position of sector gates (clapets), which are unique for the country (with the length of each gate about 20 meters the assembly weighs 56 tons).            
28.06.2013
The electric generators for HPP "San Andreas" are manufactured.
At the end of June 2013 HPP "San Andres", Panama two generators’  assembly and testing were completed. The up-to-date  technology and modern designs have been used in the manufacture of this equipment.
The equipment supplied by "Energomashexport Corporation" LLC is always marked by its quality and reliability.
17.06.2013
16th International Conference «Private Power in Central America»
13-14 June 2011 in Panama City was held the 12th International Conference «Private Power in Central America», devoted to the problems of the private power supply development in the region. Together with the conference was organized the exhibition. Energolatina SA  (subsidiary of "Energomashexport  Corporation LLC") made a booth at the exhibition and shared its experience of the implementation of hydropower projects in Panama: HPP "Bajo de Mina" and HPP "Baitun" (already in commercial use), and HPP “San Andres”,  mini-HPP "Bajo de Mina", mini-HPP "Baitun" and HPP "San Lorenzo" (under construction). Detailed information about the conference and the presentations can be found on the official website:
20.05.2013
New contract in Panama.
May 13, 2013 Energolatina, SA  (a subsidiary company of "Energomashexport Corporation LLC" in Panama) - signed with Hidroeléctrica San Lorenzo, SA, owned by Spanish Grupo Cuerva, a contract for the installation and commissioning of hydro-mechanical equipment for the HPP "San Lorenzo" which is now under construction on the river Fonseca in the province of Chiriqui. In addition to installation work scope of the contract also provides for the design, manufacture and supply of the missing equipment.            
07.03.2013
Conference “Russia Power 2013”

On March 5-6,a.c. XI annual international exhibition and conference “Russia Power 2013” went off at EXPOCENTER in Krasnaya Presnya.

Traditionally all leading companies operating in power sector attend the said exhibition and conference.  “Energomashexport Corporation” LLC participated in the exhibition with a big stand where numerous meetings and talks with our business partners were held. Specialists of our company took an active part in the events and seminars arranged within the framework of the conference as well.            
28.12.2012
New Contract in Panama
On December the 28th “Energomashexport Corporation” LLC and CILSA Panama, S.A. signed a Contract for “Baitun” HPP extension, i.e.: construction of 1,7 MW mini HPP on ecological dam spillway. The Contract is for electromechanical equipment on “turn-key” basis (Water-to-Wire package). The Contract was awarded as a negotiable order (without bids) that proves the Customer’s confidence to the equipment and services provided by our company. 
17.12.2012
Preliminary Acceptance Certificates for "Baitun" HPP Units are signed.
The Customer and "Energolatina" S.A. - our daughter company - signed PAC for the Units of "Baitun" HPP, Panama. It came so that the said momentous event happened the same day the Contract for supply of the equipment for this very HPP was signed 4 years back, i.e.: December the 17th
31.10.2012
On October 29-31, a.c. “Energomashexport Corporation” LLC (EME Corp.) took part in the annual conference and exhibition “HYDRO 2012” went off in Bilbao (Spain)
World leading companies from 80 countries working in hydropower sector were represented at the exhibition. EME Corp. team participated both in the plenary sessions and in the seminars on various hydropower aspects (strategic finance, project management risks, new approaches to development of power market, technical innovations, etc.). Quite a number of meetings and business talks with manufacturers, companies specialized in design, civil construction and hydroproject operation from different countries were held. Totally around 150 representatives from 30 companies attended our stand.
13.04.2012
Adlerskaya TPP project. Works on equipment supply are finished
11/04/2012. Adlerskaya TPP project. Works on equipment supply are finished. The works on supply of high and low pressure fast-response pressure-reducing and desuperheating systems and also desuperheating and pressure reducing system for Adlerskaya TPP are successfully finished. The services for supervision of supplied equipment and plant operations training are completely rendered.
11.01.2012
Panama. “Bajo de Mina” HPP Put in the Commercial Operation
Panama. “Bajo de Mina” HPP Put in the Commercial Operation “Bajo de Mina” HPP, Panama, was transferred for commercial operation to National Control Center. As of today summarized output of the Units exceeds 50 000 MW/h. The Customer appraised professionalism, quality and punctuality of our work as well as high efficiency of our equipment. It’s necessary to give credit to our partners, i.e.: “Kharkovturboengineering” LLC & “Energolatina S.A.” who ensured excellent operation of new power plant.
22.12.2011
New Contract in Panama
New Contract in Panama As a result of international bids “Energomashexport Corp.” LLC was awarded with a contract for implementation on “turn-key” basis of electro-mechanical part of SAN ANDRES HPP Project , Panama (paquete Agua-A-Alambre). The Contract was signed on 22.12.2011. The event proved recognition of our company on the power market of Panama, illustration of both high quality design and manufacture, delivery and erection of the equipment demonstrated by the Company during execution of the works of “Bajo de Mina” & “Baitun” HPPs Projects
07.11.2011
“Energomashexport Corporation” LLC (EME Corp.) signed a Contract for supply on “turn-key” basis equipment for construction of “SCHERBINKA” TPP located in South Butovo district, Moscow (3 combined cycle units of 125 MW each
In accordance with the Contract in 2013-2014 EME Corp. shall supply to the Customer 6 sets of SGT-800 gas-turbine generating units of Siemens Industrial Turbomachinery AB production, 3 steam turbines, 6 waste heat recovery boilers, air-condensed unit and other equipment including accessories and spare parts.
28.10.2011
“Energomashexport Corporation” LLC finalized the work on design supervision of the final assembly and shop tests of the runners for three hydrounits of Kamskaya HPP of JSC “RusHydro
“Energomashexport Corporation” LLC finalized the work on design supervision of the final assembly and shop tests of the runners of hydrounits Nos.9,10,11 of Kamskaya HPP of JSC “RusHydro” at the manufacturing plant JSC “Tyazhmash” (city of Syzran). All the works were executed in accordance with the Contract obligations and the Customer issued the correspondent acceptance acts
23.09.2011
Yaiva TPP (Russian Federation). 400 MW Combined-Cycle Unit Turn-Key Project
Yaiva TPP (Russian Federation). 400 MW Combined-Cycle Unit Turn-Key Project. On 21/09/2011 new 400 MW Unit at Yaivinskaya TPP built basing on advanced modern technology was officially put into operation. The inauguration function was attended by Mr. Oleg Chirkunov, Governor of Perm Territory, Mr. Sergey Tazin, Chairman of the Board of Directors of “E-On Russia” as well as representatives of general contractors – ENKA (Turkey) and “Energomashexport Corporation” LLC (Russia).
18.07.2011
State Technical Supervision Authority “Rostekhnadzor”
On 18/07/2011 State Technical Supervision Authority “Rostekhnadzor” issued Permission for putting into operation auxiliary boiler plant providing steam supply to 400 MW combined-cycle Unit at start-up (one 2,23MW steam boiler) and heating water supply to anti-icing system of air preparation for gas turbine and for main plant house heating (three hot-water boilers – 10,2MW).
07.07.2011
Yaiva TPP (Russian Federation). 400 MW Combined-Cycle Unit Turn-Key Project
Yaiva TPP (Russian Federation). 400 MW Combined-Cycle Unit Turn-Key Project. On 07/07/2011 State Technical Supervision Authority “Rostechnadzor” issued Permission for putting into operation electrical equipment of EME Corp. scope of work within the framework of Yaiva TPP Project, i.e.: electrical equipment of 400 MW combined cycle unit, 220 kV open switchyard, auxiliary boiler plant, circulating pump plant of service water supply.
01.07.2011
“Yaiva” TPP. Trial Run of Combined-Cycle Unit is Completed

01.07.2011 “Yaiva” TPP. Trial Run of Combined-Cycle Unit is Completed. 72 hour trial run of 400 MW combined-cycle unit at YAIVA TPP (Russian Federation) is completed.

The Unit was operated during 72 hours at 400 MW load generating power to the United Generation System of the Russian Federation. The said trial run is the final stage of erection and commissioning works at the new Block results of which prove suitability of the equipment for commercial operation.            
06.06.2011
“Energomashexport Corporation” LLC signed a Contract for design supervision of the final assembly and shop tests of the runners of three hydrounits of Kamskaya HPP of JSC “RusHydro”

“Energomashexport Corporation” LLC signed a Contract for design supervision of the final assembly and shop tests of the runners of hydrounits Nos.9,10,11 of Kamskaya HPP of JSC “RusHydro”.

The work is to be executed at the manufacturing plant JSC “Tyazhmash” (city of Syzran). The scope of work included the following:
- Examination of the Quality Certificates and recommendations on acceptance of the components for further manufacture stage;
- Participation in check of conformity of the components’ geometrical dimensions to the ones indicated in the Certificates;
- Supervision of the runners’ final assembly and shop tests effected by the specialists of the manufacturing plant;
- Supervision of the clearances’ check as well as operation tests fulfilled by the specialists of the manufacturing plant;
- Recommendations to the plant specialists directed to provision of the results the final assembly, clearance check, operation tests to the requirements of the Technical documentation.