Current projects
Implemented project
THERMALPOWER
HYDROPOWER
Baitún HPP
The Contract for “Turn-key” execution of electromechanical construction part of Baitun HPP (2x43 MW), Panama
Bihagua HPP
Design, supply, supervision of installation and commissioning of 2 groups of turbine-generator, governors, excitation systems and butterfly valves for Bihagua HPP (2õ8,75 MW), Costa Rica.
CH Bajo de Mina
The Contract for “Turn-key” execution of electromechanical construction part of Bajo de Mina HPP (2x30 MW), Panama.
Corumbá III HPP
Design, supply, erection and commissioning supervision of hydro turbine equipment for Corumbá III HPP (2x47 MW), Brazil.
Goiandira HPP
Design, supply, erection supervision of hydro turbine and generator equipment for Goiandira HPP (2x13,5 MW), Brazil.
Infernillo HPP
The Contract for hydro generators modernization of hydro units number 5 and number 6 of Infernillo HPP (Mexico) with the nominal capacity increase of each hydro generator from 180 MVA to 211 MVA.
Kamskaya HPP
Kamskaya HPP, Russia. There are 2 hydro turbines of Kaplan type (PL20-B-500) which are under modernization (with the power increase) in partnership with Tyazhmash JSC.
Kaunasskaya TPP
Kaunasskaya TPP, Lithuania. The Contract for the development of technical documentation for the modernization, operational improvement and equipment regime adjusting of the Kaunasskaya TPP. The Customer is Kaunas Heat and Power CJSC.
Kolpino TPP
The Contract on supply and erection supervision works of boiler and auxiliary equipment for CCPP-90, GSR-Energo TPP, Kolpino, Russia
Kruonio PSPP
Kruonio PSPP, Lithuania. The Contract for consulting services on preparation of the review of international experience in extending the power control range of pump storage power plants and preliminary recommendations on possible ways of increasing equipment adjustment (control) range installed on Kruonio PSPP.
Nova Aurora HPP
Design, supply, erection supervision of hydro turbine and generator equipment for Nova Aurora HPP (2x10,5 MW), Brazil.
Novgorodskaya TPP, CCPP-210
The steam line supply of high and low pressure from waste-heat boilers to steam turbines, fast-response PRDS of high and low pressure and switchgear produced by Holter Regelarmaturen GmbH (Hora), Germany
Panevezhskaya CCP
Panevezhskaya CCP, Lithuania. The Contract for the technical and detailed design project development of the upper level control and management system of Panevezhskaya CCP. The Customer (General contractor) is Elinta CJSC.
Passo São João HPP
Design, model tests of Hydro turbine equipment for Passo São João HPP (2x39,4 MW), Brazil.
Rucatayo HPP
Design, supply, erection and commissioning of all electromechanical equipment based on the Contract for “Turn-key" execution of Rucatayo HPP (1x53 MW), Chile
San Andres HPP
The Contract for Turn-key execution of electromechanical construction part of San Andres HPP (2x5,15 MW), Panama
San Bartolo HPP
Contract for design, manufacture, supply, supervision of erection and commissioning of main equipment for San Bartolo HPP (2õ10,5 MW), Panama.
Shaturskaya SDPP (GRES), CCPP-400
Set of works on "Turn-key" construction of auxiliary steam power unit pipeline CCPP-400, built on Shaturskaya SDPP (GRES), WGC-4 JSC (equipment and materials supply, civil construction and erection works, commissioning works, putting into operation).
Step-down substation Bersenevskaya
Step-down substation Bersenevskaya 110/20/10/6 kV 2õ160 MVA was put onto operation in September 2016. Energomashexport Corporation LLC provided delivery of set if equipment for the presence substation.
Substation Vagankovskaya
Substation Vagankovskaya 220/20 kV with high voltage cable lines was put onto operation in February 2015. Energomashexport Corporation LLC provided delivery of set of equipment for the present substation.
Substation Zolotarevskaya
Substation Bersenevskaya 220/20 kV was put onto operation in December 2014. Energomashexport Corporation LLC provided delivery of set if equipment for the present substation.
TPP-21
Complete supply of technological equipment (process pipeline and pipeline valves) and installation supervision of 3 circulating pumps for construction needs of block ¹ 11, CCPP-450T, TPP-21, Mosenergo OJSC, Russia.
TPP-26
TPP-26, Mosenergo OJSC, Russia. Supply of hydraulic couplings, fittings, lifting equipment and gas supply system equipment for construction needs of power unit number 8 CCPP-420, Mosenergo.
Yaivinskaya SDPP (GRES)
Energomashexport Corporation LLC completed the design, engineering, supply, "Turn-key" construction of the complex facilities in terms of the project execution "Replacement capacity Establishment based on CCPP-400 of Yaivinskaya TPP branch, WGC-4 JSC,