back

CH Bajo de Mina

The Contract for “Turn-key” execution of electromechanical construction part of Bajo de Mina HPP (2x30 MW), Panama.

The Employer CILSA Panama S.A. has concluded a contract for general design, manufacture, supply, installation and commissioning of electromechanical equipment used in the construction of Bajo de Mina HPP.

Bajo de Mina HPP is located on the Chiriqui Viejo River near Plaza Kaysan, Renasimiento district, province of Chiriqui, Panama, production capacity of 2x30 megawatts.

General Project Data:

Employer:   CILSA Panama S.A.
Installed Capacity:   2 x 30 MW
Type of Turbine:   Francis, vertical
Start of works:   December 2008
Startup of Unit 1, 2:   December 2011

Scope of EMECO works:

General design, supply, erection and commissioning of the whole electromechanical equipment (main equipment, Hydro mechanical equipment, BOP).