The Contract on supply and erection supervision works of boiler and auxiliary equipment for CCPP-90, GSR-Energo TPP, Kolpino, Russia

General Project Data:

Employer:   GSR TPP, CJSC
Construction general Contractor:   Engineering-Construction Corporation SOYUZ, JSC
Capacity:   110 MW
Start of works:   January 2011

Scope of EMECO works:

Design, manufacturing and supply of waste-heat boiler including supervision services. Supply and supervision of main volume of auxiliary equipment including:

  • Mechanical cooling towers
  • Water treating plant
  • Lifting equipment
  • Electric equipment including Transformers CH, switchgear and control gear - 6 kv, etc.
  • Fitting and pipelines of high and low pressure (in full volume)
  • Pump and heat-transfer equipment