back

Passo São João HPP

Design, model tests of Hydro turbine equipment for Passo São João HPP (2x39,4 MW), Brazil.

General Project Data:

Employer:   Energ Power S.A.
Capacity:   79 MW
Type of Turbine:   Kaplan, vertical
Start of works:   September 2006
End of works:   March 2008